Project Experience

From independent estimates on South Australia's largest transport projects to project management and estimating across Far North Queensland.

Major transport infrastructure

Recent roles for the South Australian Department for Infrastructure and Transport (formerly DPTI) and Tier 1 contractors. Sempac staff have also prepared contractor bid estimates on projects including an $80m Bruce Highway six-lane upgrade (Qld).

Tram Grade Separations Project

$870m · Alliance · Independent Estimator for DIT, 2023 to present. Removal of three congested level crossings on the Glenelg tram line at Marion Road, Cross Road and Morphett Road, rebuilding of the South Road tram overpass at Glandore, and upgrades to the Marion Road, Anzac Highway and Cross Road intersections. Tram services returned in January 2026.

Photo: Arup

Victor Harbor Road & Main South Road Duplication

$560m · Alliance · Independent Estimator for DIT. Fleurieu Connections: duplication of about 4 km of Victor Harbor Road between Main South Road and McLaren Vale, and of Main South Road from Seaford to Sellicks, with grade-separated intersections and a major bridge over Pedler Creek.

Photo: ecoDynamics

Northern Connector

$867m · Design & Construct · Cost Manager for Lendlease Engineering. A 15 km, six-lane motorway north of Adelaide linking the Northern Expressway, South Road Superway and Port River Expressway, completed in 2019.

Photo: ecoDynamics

Darlington Interchange

$754.5m · Design & Construct · Independent Estimator for DPTI. About 3.3 km of non-stop motorway on Main South Road between the Southern Expressway and Tonsley Boulevard, with a free-flow Southern Expressway interchange and grade separation at Ayliffes Road and Shepherds Hill Road. Completed in January 2021.

Artist's impression: Department for Infrastructure and Transport

Truro Bypass & Hahndorf Township Upgrade

$500m · Alliance · Independent Estimator for DIT. New Verdun and Peachtown interchanges, Mt Barker interchange upgrade and Hahndorf main street works, plus the Truro bypass, which would take Sturt Highway heavy vehicles around the township.

Concept image: Department for Infrastructure and Transport

Port Wakefield to Port Augusta Alliance

$358m · Alliance · Independent Estimator for DPTI. Duplication of the Joy Baluch AM Bridge at Port Augusta, which carries more than 17,000 vehicles a day across Spencer Gulf, plus the Port Wakefield overpass and township duplication, and Augusta Highway duplication and overtaking lanes.

Photo: CPB Contractors

Regency to Pym (R2P)

$354m · Alliance · Independent Estimator for DPTI. New six-lane, 1.8 km non-stop motorway along South Road between Regency Road and Pym Street, with the bridge deck built off-site and moved into place on self-propelled transporters. Completed in 2021 as part of a 47 km non-stop route from Gawler to the River Torrens.

Artist's impression: Department for Infrastructure and Transport

Gawler Rail Electrification

$330m · Design & Construct, then Alliance · Independent Estimator for DPTI. Electrification and modernisation of the 42 km Gawler line, Adelaide's busiest rail corridor. Passenger services returned in June 2022, with new electric trains and a new pedestrian bridge at Gawler Central.

Photo: ACCIONA

Ovingham Level Crossing Removal

$231m · Alliance · Independent Estimator for DIT. Torrens Road raised over the interstate freight line and the electrified Gawler line, removing a level crossing where boom gates were down about 12 minutes an hour at peak times. Includes around 30,000 m² of new public open space beneath and beside the bridge.

Photo: Arup

Torrens Rail Junction

$155m · Alliance · Independent Estimator for DPTI. Lowered the Outer Harbor passenger line beneath the ARTC interstate freight line, removed the Park Terrace and Gibson Street level crossings and relocated Bowden station.

Kings Highway Nelligen Bridge Replacement

$120m · Contractor bid estimate (NSW). Replacement of the Kings Highway bridge over the Clyde River at Nelligen.

North Terrace Tram

$60m · Design & Construct · Independent Estimator for DPTI.

Far North Queensland projects

Projects where Sempac personnel provided project management and estimating, including a long involvement with Cairns Airport.

East Evelyn Range Upgrade

Qld Department of Main Roads · $13m. Range road upgrade through World Heritage rainforest. Estimating by Daniel Tregenza; project management by John Spannenburg.

Cairns Airport – Apron Bays 9–13

Apron and aircraft pavement works. Project management and estimating.

Cairns Airport – AQIS Facility

AQIS facility and associated civil works. Project management and estimating.

Cairns Airport – Hawker Pacific Hangar

Hangar and hardstand works. Project management and estimating.

Cairns Airport – Business Park

Business park civil works. Project management and estimating.

Phosphate Mine Tailings Dam

Tailings dam construction.

Oakey Creek Dam Decommissioning

Dam decommissioning works.

RAAF Base Townsville

Reinforced earth structures.

Triton Street Bridge, Palm Cove

Bridge and road works.